• LocationBielsko-Biala, Poland
  • Completion2021
  • ClientCavatina Holding S.A.
  • ArchitectCavatina Holding Architects
  • PartnersZeman HDF

Cavatina Hall – a mission for the orchestra of steel construction specialists from the ZEMAN Group.

The Cavatina Hall in Bielsko-Biała, Poland, has become a new landmark in contemporary steel and glass architecture. The real estate company Cavatina Holding S.A. has realized the BREEAM certified multifunctional building with its centerpiece – a concert hall for 650 listeners – in 2021. The semicircular and sound-absorbing concrete structure of the concert hall was clad with a complex steel construction and with an unusual spiral-shaped glass envelope. Two companies of the ZEMAN Group were significantly involved: Zeman HDF, who were responsible for the steel supply and installation. And Waagner Biro steel and glass, who were leading the engineering of the whole steel and glass structure and beyond that also responsible for supply and installation of all facade elements including 887 different pieces of glass.

The project was realised in less than 12 months only and handed over to the client Cavatina to their full satisfaction.